From a failed report to a finished floor
The sequence is fixed on purpose. We do not quote a coating before we have read the result, and we do not treat a works docket as proof the floor now meets the rating.
1. You send the report we are meant to read
The product is the PDF you already hold: an in-situ wet-pendulum or AS 4663 report, with locations, slider type, P-ratings and whatever notes the tester wrote. Photos of the floor help; they do not replace the table of results.
If you have been told a kitchen needs P4, a ramp needs P5, or a hospital wet area has to meet a figure drawn from HB 198 or the NCC, put that in the notes. If you do not know the target, say so. Guessing a rating in the form does not make it the right one.
2. We write an opinion, not a slogan
Someone here reads the report against the covering and the use of the space. The opinion names one of four paths: change cleaning and chemicals; apply an anti-slip treatment to the existing floor; grind and profile; or replace the covering. It says why that path fits, and what would be wasted effort.
The opinion is advice for a contractor scope. The works report describes what we did; a retest is a separate measurement.
3. You get a quote for those works
Price follows the opinion. The quote covers the recommended intervention, preparation, access and any making-good that belongs with it. If two paths are plausible, we say so and price the one we would do first — usually the lightest that can still reach the required rating.
4. We do the works on your site
Once you instruct us, we attend and carry out the agreed work. Coverage is national. The conversation on site is about that floor: hours of access, isolation, curing time, and what the covering will look like when we leave.
5. A retest is booked after, not instead
When the surface is ready to be measured again, we arrange a retest. That visit is a separate step. The document we leave after grinding, treating or replacing a floor describes the works. It is not a compliance certificate and it is not a substitute for a new pendulum reading.
What we need from you
- The slip test PDF, even if it is a few months old.
- Site address and the area type — kitchen, bathroom, entry, pool, hospital, school, or other.
- The P-rating you have been asked to meet, if anyone has named one.
- A deadline if an insurer, auditor or occupier has set one.
- Anything about after-hours access, occupied wards, or a floor that cannot be taken out of service for long.
What you should not expect
- A promised pass before we have read the report.
- A universal coating that turns every finish into P5 overnight.
- A works report that you can file as the new test.
Ready to send the PDF?
The quote form is the start of the job. Call 1300 207 915 if the report is sitting on a desk and you would rather talk first.